A Homeowner’s Guide to Emptying Cabinets, Moving Appliances & Getting Ready

So, you’ve made the exciting decision to upgrade your kitchen with beautiful new cabinets. Whether you’ve chosen custom, semi-custom, or ready-to-assemble options from Carr Cabinets, your project is about to transform your space — but proper preparation is key.

Before your new cabinets arrive, there are some essential steps to take to ensure a smooth, efficient, and stress-free installation.

In this guide, we’ll walk you through how to prepare for new kitchen cabinets, including how to empty cabinets, move appliances, and protect your home during the remodeling process.

Why Preparing for Cabinet Installation Matters

A successful cabinet installation isn’t just about skilled installers — it also depends on the condition of the space they’re working in. Preparing ahead:

  • Helps avoid delays

  • Protects your flooring, appliances, and countertops

  • Speeds up the installation process

  • Reduces stress during your kitchen remodel

Let’s dive into the checklist that can help you prep like a pro.

Step 1: Empty Your Kitchen Cabinets Efficiently

Emptying kitchen cabinets before a remodel may sound simple, but doing it right takes a little planning.

Here’s how:

  • Start Early: Begin clearing out cabinets at least a week before the scheduled install. Prioritize rarely-used items first.

  • Sort & Declutter: Use this time to toss expired pantry goods and donate kitchenware you don’t use.

  • Label Boxes: Group similar items together (e.g., baking, daily dishes, pantry items) and clearly label the boxes for easy unpacking.

  • Set Up a Temporary Kitchen: Keep essentials like a coffee maker, microwave, utensils, and basic cookware in a separate “survival zone” so you can function during the remodel.

Step 2: Move Appliances (Safely)

If your kitchen remodel includes layout changes or replacing lower cabinets, you’ll likely need to move appliances before cabinet installation. Here’s what to keep in mind:

Refrigerator

  • Remove all food items and unplug 24 hours before moving

  • Use appliance sliders or a dolly to prevent floor damage

  • Store perishables in a cooler or backup fridge

Range or Stove

  • For gas ranges, turn off the gas valve before disconnecting

  • For electric stoves, ensure the circuit breaker is off

  • Clean thoroughly before storage to prevent odors

Dishwasher

  • Turn off the water supply and unplug the power

  • Remove any remaining water and disconnect the drain line

Microwave, Small Appliances & Built-Ins

  • Remove anything mounted under cabinets (microwaves, wine racks, etc.)

  • Safely store countertop appliances to avoid breakage

Step 3: Clear the Work Area

To ensure your installers have a clean, safe workspace, take the time to:

  • Remove furniture, rugs, trash cans, and mats

  • Take down decor or floating shelves that might be in the way

  • Cover adjacent flooring or passageways to protect from dust and foot traffic

  • Use plastic sheeting to separate your kitchen from living areas during demolition or installation

Step 4: Know Your Cabinet Installation Timeline

At Carr Cabinets, we help you coordinate the process from delivery to installation. Most kitchen renovations follow this flow:

  1. Cabinet Delivery (1–2 days before installation)

    • Ensure you have space in the garage or home to stage the boxes.

  2. Demolition & Old Cabinet Removal

    • Clear and prep the space before this stage.

  3. New Cabinet Installation (1–3 days)

    • Duration depends on size, layout, and custom features.

  4. Countertop Templating (if needed)

    • This typically happens after cabinets are installed.

  5. Final Touches – Molding, hardware, adjustments, etc.

Bonus: Tools & Supplies You Might Need

While your installation team will bring their tools, here are a few homeowner prep essentials:

  • Painter’s tape for marking locations or reminders

  • Ziplock bags for screws or parts you may need to reuse

  • Furniture sliders to protect floors

  • Cardboard sheets or drop cloths to cover walkways

  • Vacuum or broom to clean dust after demo

Kitchen Remodel Prep Checklist

Here’s a quick-reference checklist for preparing your kitchen:

  • Empty all cabinets and drawers
  • Pack and label items clearly
  • Set up a temporary cooking area
  • Move or disconnect appliances
  • Clear furniture and rugs from work zone
  • Protect floors and walls
  • Prepare for dust and noise
  • Make room for cabinet delivery
  • Confirm installation timeline with your contractor

Final Thoughts: Be Ready to Enjoy Your New Kitchen

With a little planning and preparation, you’ll make the most of your cabinet installation experience — and avoid common headaches during your kitchen renovation.

At Carr Cabinets, we’re here to guide you every step of the way. Whether you’re replacing outdated cabinets or doing a full kitchen makeover, our team ensures you have beautiful cabinetry and a seamless process.

Explore our full line of semi-custom and RTA cabinet options here and get inspired for your next kitchen upgrade.

Ready for a Project?

Here’s how to get started:
  1. Schedule an On-Site Appointment with us by calling (772) 222-7434. Or submit the online form here.
  2. Meet and share ideas to begin planning your dream space. This will help us provide 3D renderings to visualize it.
  3. Visit our Showroom to select cabinetry colors, door styles, countertops, knobs, pulls, sinks and more.
  4. Receive an itemize estimate of cost for your project.
  5. Choose Carr Cabinets for your next remodeling project!

Contact Us